| Site Mixed Concreate |
JOHNSON RMC |
| Wastage in Site Mixing |
Wastage are avoided |
| Wastage of Concreate during handling |
facilitates pumping of concreate |
| Maximum Manpower |
Minumum Manpower |
| Huge amount of Time |
Less Time |
| Required Huge Space |
Saving Space |
| Continuous cleaning and house keping operations |
Virtually eliminates all house keeping and cleaning operations |
| High cost of testing cost |
take care of total testing |